The project was aimed at renewal for an existing office building, Iride 18, completed in 2005, and bring it to conformity on existing operation and fire safety standards. A full modification of internal space designations was proposed and it covered all levels of the office building.
Two outside access pathways to the first floor of the buidling were dismantled. Due to these modifications it was neccessary to rebuild the affected facade areas.
A new metal frame stairway was built in the lobby that has an intermediate platform which links the ground floor with the first floor.
The internal compartment walls on the ground floors between the traffic areas of the main facade have been reconfigured through a lobby area resizing and also a cafe and meeting room with a view towards the interior light courtyards were created.
The project received 2022 BigSEE Slovenia Award.